I’m trying out this cable zip tie solution to run pitot and electric lines.
Wrapped up some stray rivets

And test fitted some baggage floor and seat pan parts.

Building and Eventually Flying N826PM
I’m trying out this cable zip tie solution to run pitot and electric lines.
Wrapped up some stray rivets
And test fitted some baggage floor and seat pan parts.
Got the bushings and bottom plate for the gear and riveted a good part of the firewall to the fuselage. Pictures tomorrow when I actually start lining up and drilling the nosewheel fork and making the mods for the Viking Bungee replacement.
Standing on my head and back drilling these with a right angle attachment was not my favorite at all.