Got the wing skin on the pilot site top riveted today. Had been holding off for the pitot tube installation.

Then it was on to the baggage compartment.

Building and Eventually Flying N826PM
Got the wing skin on the pilot site top riveted today. Had been holding off for the pitot tube installation.
Then it was on to the baggage compartment.
Finishing this took about 90 minutes longer than I planned for, but Iβm happy with the result.
Doing a pitot tube cover type mount from mykitairplane.com. Got some good advice from the internet on cutting the hole.
I’m super happy with the result. Next up, the backing plate and running the tubing.
Finally getting around to doing the seats. I’ve not decided how to finish them. I’m sure I won’t leave them as lawn chair style π
Been planning on four part harnesses for a long time. Viking Aircraft has the brackets I needed and they were a snap to install.
Then I finally fixed these brackets which I had on the wrong side. Yay for mistakes!
Any progress on the build is progress